aerials

Update: 2023 Aerial Services and Contour Download

This information and more can be found on the 2023 Flight page.

2023 Aerials Dynamic and Tiled Image Services

Both the dynamic and tiled image services of the 2023 aerials are now complete and available, along with metadata. Find them:

2023 1-foot Contours

In an effort to make data available as soon as possible, there is now a large block contour data download. Four large blocks cover the state. The advantage is that there aren't many files to download. The disadvantage is the file size for both download and storage. The contours are being processed and will be available in smaller chunks in both geodatabase and shapefile format.

Large Block Contour Data Download

2023 NAIP Dynamic Image Service

NAIP is leaf-on imagery collected by the USDA National Agriculture Imagery Program. The 2023 Geotiff tiles have been processed and are now published as an image service. Find it:

Map and Image Services page under Imagery - Summer Statewide, then 2023 NAIP Summer, 4 band, 0.3m.

What's next?

Elevation. The 0.5 meter DEM is on the way and publishing the elevation services is a high priority.

Download. Download is another high priority. Once we receive the final tiles and metadata, they will be processed and zipped up for download via an interactive download tool.

Viewers and Web Pages. We are updating viewers and informational web pages as fast as possible.

Check back on CT ECO new for future updates and delivery news.

We also have some updated viewers in the works, stay tuned!

Update: 2023 Aerials and More

It is high time for a data update!

The final aerial tiles including true orthos* were delivered a few weeks ago and a statewide, final, dynamic, image service is now available on CT ECO! Find the service on the

*True orthos are tiles are ones that were selected because they contained tall buildings or bridges. They have received extra correction to avoid shadows and distortions.

What do you do with an image service?

If you are a GIS user, it is possible to connect to the service in your GIS software so that it can be used with other layers. The service can be manipulated to change the band combination, stretch, and more.

If you are not a GIS user and want to take a peak, go to the service link and then click on ArcGIS Online Map Viewer. This opens the service inside the ArcGIS Online Map Viewer where you can zoom in and out, move around, search for an address, and more.

What’s next?

Service. Although the dynamic service is the foundation of things to come, it is not the end. The next step is to create a tiled, or cached, version that will draw even faster. The tiled service will be available to users and it will be added to existing viewers like the Aerial Imagery Viewer.

Download. Once we receive the final metadata, hopefully by the end of the month, we will start packaging the 23,000+ image tiles into zip files for the download tool. If you are in dire need of image files before that, send us an email and we will do what we can to get them to you.

Elevation. We hope to receive the final elevation files in the next few weeks as well. Once that happens, we will create an elevation image service and derivative services such as hillshade, shaded relief, slope, and aspect. Following that, the elevation tiles and their metadata will be zipped and added to the download tool. Contours are also slated for delivery and will be served by the CT GIS Office. CT ECO will likely provide static download of contour blocks that are bigger than tiles but still a reasonable file size.

Other Layers. The buildings and 3D buildings should be finalized soon as well. Stay tuned for updates and info about where and how to access them.

Check back on CT ECO new for future updates and delivery news.

Aerials 2023 screenshot

First 2023 Aerials Delivery

2023 Flight Blocks Status 1

I am happy to report that the first batch of 2023 aerials has been received, published, and is looking good!

The first delivery consisted of all of block 1 (parts 1 and 2) and parts 1 and 2 of block 4.

The aerials are currently available as a dynamic image service on CT ECO. A dynamic image service is not tiled and may take a few seconds to draw. It may also be unavailable from time to time as we add more parts and make updates.

Once we receive full delivery and metadata, we will work as fast as possible to create

  • the statewide dynamic image service,
  • the statewide tiled image service, and
  • data download.

Check back (CT ECO news) for future updates and delivery news and the 2023 flight page for more information.

2023 Aerial of UConn campus

Update on Imagery and GIS data

Update by Carl Zimmerman, PhD, CT GIS Office 

Flight blocks

This is an update from the CT GIS Office on the production, review, and publication of the imagery and GIS data collected during the spring 2023 flight. The production is divided into four geographic blocks: Block 1 (northwest), Block 2 (southwest), Block 3 (central), and Block 4 (eastern).

The four steps in the data production process are:

  1. data is collected and processed by the Vendor;
  2. it is reviewed by the GIS Office;
  3. errors and issues are sent back to the Vendor who assesses and corrects them, and then
  4. the final product is delivered to the GIS Office for publication and access by CT ECO and/or the GIS Office. 

Quality Assessment/Quality Control (QA/QC) Process

There are multiple levels in the QA/QC process. First is an initial data assessment and quality review by the Vendor (part of step 1, above) which includes numerous validation steps and a review by their subcontractor. Once received, a second QA/QC review is performed by the GIS Office and participating stakeholders (part of step 2, above) where the team assesses different areas of the different datasets in order to identify any issues or errors within the massive data sets. Currently, we are in the most intense part of the QA/QC process and are evaluating some issues that have been identified by the Vendor and our own review. We are working to determine and negotiate a mutually acceptable set of solutions which impacts the speed of delivery to our users. 

Status of the Imagery and GIS data sets 

True Color Ortho Imagery (RGB) 

The initial delivery of Blocks 1, 2, and 4 to the GISO has occurred.

  • Block 1 errors have been corrected by the Vendor (step 3, above) and should be arriving at the GISO soon (step 4)!
  • Block 2 issues are being reviewed by the GISO now (step 2) and will be sent back to the Vendor for correction this week or next.
  • Block 3 is coming the next two weeks (step 1).
  • Block 4 issues are being reviewed (step 2) and will be sent back to the Vendor next week (step 3).

We expect the full and final imagery dataset to be available in July. In the meantime, CT ECO will host imagery blocks as soon as they are delivered, although they should be considered “beta” versions.

Near Infrared Imagery (NIR) 

The near-infrared band is collected with the true color imagery and is usually treated as one. Unfortunately, a technical issue has been identified near the shoreline for Block 2 where the near-infrared data is “bleeding” into the other areas and is impacting the usability of the data. The delivery (step 1) for the coastal parts of Blocks 2, 3 and 4 is on hold until this issue has been solved and the imagery has been resubmitted by the Vendor to the GISO. Updates to come. 

Lidar-Derived DEM and Contours 

The digital elevation model (DEM) is a 2 foot pixel representation of the bare earth elevation. The DEM creation is progressing well and is expected to be finished in the late summer. The 1-foot contours data set is derived from the DEM and will be delivered after the DEM in early fall.  

2D and 3D Building Footprints 

The new 2D building footprint layer will include about 1.9 million buildings across Connecticut. The initial review of Blocks 1 and 2 is mostly finished but some quality issues were identified, and iterative improvements are being performed. Blocks 3 and 4 will not be delivered until the quality issue is resolved. This data set will be available end of summer or early fall. The 3D Building Footprints will be completed last to ensure that all iterative corrections are accounted for. Expect the 3D Building Footprints in the fall.   

Classified Lidar Points

The classified lidar is meeting specifications for capture density, overlap, and classification quality. This data set will be delivered in the fall after the other data sets are completed and produced. 

Lakes, Streams, and Shoreline Polygons and Polylines 

These data sets are used for creation of other datasets, particularly the elevation. They will be delivered in the summer. 

CT Imagery Delivery Update

Written by Carl Zimmerman, PhD, GIS Coordinator, CT GIS Office (email: carl.zimmerman@ct.gov

The first wave of Imagery, Elevation, and GIS data are now being delivered to the GIS Office and are undergoing a Quality Assurance review. The imagery data we have seen so far (NW CT) looks quite good. A nice example of the quality is the natural color imagery capture of the Kent School on the banks of the Housatonic River.

2023 aerial example, Kent School
2023 Ortho aerial imagery of The Kent School

The bare earth surface dataset, called a Digital Elevation Model (DEM), also looks great with remarkable detail. Below is an example of remnant ox bows (old river meanders) captured underneath the tree canopy that highlights geomorphology features captured by the Lidar data.

2023 DEM sample
2023 bare earth DEM

In addition, we are receiving GIS data such as the building footprints and water features. We are expecting to have around a million building footprints delivered by the end of the project that cover every town in Connecticut.

2023 GIS deliverables, Winsted example
Example of GIS deliverables, Highland Lake just west of downtown Winsted

Delivery Schedule

Flight blocks
2023 Flight Blocks and Parts

The delivery schedule has changed due to issues related to “warping” and refining the True Ortho process for cleaning up buildings in urban centers. We hope that as the Quality Assurance/Quality Control (QA/QC) process continues, the Vendor will improve their delivery speed. The new timeline is focused on completing more rural areas first followed by urban areas.

Block 1 in northwest CT was delivered first and the GIS Office will receive Block 2, part 1 and Block 4, parts 1 and 2 in the next week. The southwest CT coast will be delivered next (Block 2, part 2) along with the rest of eastern CT (Block 4, parts 3, 4, & 5). Following those, central CT (Block 3) will be delivered.

The table below includes an estimated timeline for the initial delivery to the GIS Office and final availability. For reference, following the initial delivery to the GIS Office, the following happens:

  1. the geospatial data is reviewed by the GIS Office and participating stakeholders;
  2. the review is incorporated into the dataset by the Vendor; and then
  3. the near-final dataset is returned to the GIS Office, spot checked, and is then ready for distribution.
  4. the distributors (CT ECO for aerial imagery and raster-based elevation, and the GIS Office for vector datasets) can begin work on web distribution and download which will happen as fast as possible.

In addition, 3D buildings and contours (which are derived products) will be produced after the final approval of all other data to ensure that these products have the best possible underlying quality which will be later in the summer. We appreciate your patience as we try to deliver the best possible products.

Location (type) Block Initial Vendor Delivery Estimated Availability
NW CT (imagery ) Block 1 delivered April
NW CT (GIS & elev. ) Block 1 delivered April
SW CT (imagery) Block 2, part 1 early March April-May
SW CT (imagery) Block 2, part 2 early April May
SW CT (GIS elev.) Block 2 mid-March May
Eastern CT (imagery) Block 4, parts 1,2 early March April
Eastern CT (imagery) Block 4, parts 3,4,5 April May-early June
Eastern CT (GIS & elev.) Block 4 early June July
Central CT (imagery) Block 3 May July
Central CT (GIS  & elev.) Block 3 early May July

 

CT Imagery and Lidar Delivery Schedule

Written by Carl Zimmerman, PhD, GIS Coordinator, CT GIS Office (email: carl.zimmerman@ct.gov

We are all excited about the arrival of the new data and we have received questions about when it will be available. The very high resolution and quality of both the aerial imagery and Lidar create VERY LARGE files which are time-consuming to process and review. Because of this, new vendor workflows and algorithms were required and took some extra time. We know that new imagery is a top priority and the order of dataset delivery has also been altered so that imagery is received first. We are working as fast as possible while maintaining the highest data quality. 

The following describes the delivery and timeline and we will provide updates when available. 

2023 Data Delivery blocks

Delivery Blocks

The data is broken into four delivery sections: northwest CT (light blue, first), southwest CT (dark blue), the CT River Valley (green), and finally eastern CT (brown).

Schedule

Unfortunately, there is no instant gratification in the schedule. The tasks that need to be completed before the data can be finalized and provided include the review, acceptance of edits, final delivery, and then public access. Each step takes some time – there are over 20,000 imagery tiles, billions of Lidar classified points, and over a million buildings.

If you are interested in helping to review the datasets for your town or region, please reach out. There will be a web portal and we will have some training soon to demonstrate its use. 

Tentative data schedule  Block 1
Northwest CT
Block 2
Southwest CT
Block 3
Central CT
Block 4
Eastern CT
Imagery
1. Initial data delivery via online review tool 12/8/2023 1/19/2024 2/28/2024 3/31/2024
2. Data review* (QAQC**) deadline 1/10/2024 2/14/2024 3/27/2024 5/1/2024
3. Final imagery delivery to GIS Office 1/25/2024 3/1/2024 4/15/2024 5/15/2024
Lidar and GIS Data
4. Initial data delivery via online review tool 1/31/2024 2/29/2024 4/30/2024 5/31/2024
5. Data review* (QAQC**) deadline 3/1/2024 4/1/2024 6/1/2024 7/1/2024
6. Final Lidar and GIS data delivery to GIS Office 4/1/2024 5/1/2024 7/1/2024 8/1/2024

*Data review will be lead by the GIS Office with help from the Data Acquisition Working Group and stakeholders
**QAQC stands for Quality Assurance and Quality Control

2023 Data Acquisition Update

Hi CT GIS Community:

This is Carl Zimmerman (GIS Coordinator) from the CT GIS Office, and I wanted to give you a quick update on the 2023 imagery acquisition that many of you are wondering about. After some technical and quality delays around the many buy-ups of this complicated and high-resolution data capture (e.g., Imagery, LiDAR, elevation, and GIS products (such as 3d buildings)), we have a firm schedule.

Imagery will be delivered in four blocks this Spring, and the Lidar and GIS products will follow approximately two months behind the imagery in a similar pattern. Expect to see some draft imagery from CT ECO starting in early Spring and more added over the following few months. Lidar, elevation, and GIS Products will come late in the Spring and early Summer.

For us to have the best quality for this very large data set(s), four critical steps need to be finished: 1) the imagery data will be QA/QC’d by an internal subcontractor for the Vendor; 2) the GIS Office and GIS Community will review it; 3) the identified errors will be corrected by the Vendor; and 4) the finished data will be put into web services or downloadable format for you to consume. Please be patient as we get moving on this large and detailed project. More updates to follow on our progress.

Finally, I will be reaching out to some of you in December and the early Winter for your assistance in reviewing the data. If interested in helping with this large project let Alfredo Herrera or myself know.

Thanks,
Carl

Alfredo.herrera@ct.gov (CT GIO)
Carl.zimmerman@ct.gov